Braemar College – On Location

Today, Braemar College was bathed in sunlight.Screen Shot 2015-07-30 at 11.18.23 am

IMAG1303The refurbished roof on Braemar House shone.

Our maintenance team replaced 4,000 screws during the refurbishment.

IMAG1305The new rock retaining wall outside G2 to G5 was another huge project. It involved 15 tip trucks of soil and rock, 40 metres of crushed rock and 40 metres of mulch.

Gas plumbing also had be moved to accommodate the posts used in construction.
IMAG1307

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s